Solar mounting foundation construction method - メーカー・企業と製品の一覧

Solar mounting foundation construction methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Steel pipe pile mega-solar mounting foundation method "ECS-SS"

If you want to choose the foundation for a mega solar structure based on quality and cost, the ESC-SS method is the way to go.

Minister of Land, Infrastructure, Transport and Tourism Certified Construction Method "G-ECS PILE Method". This method, recognized for its features in all aspects such as "environmental consideration," "economic efficiency," and "versatility," has been adopted in construction and civil engineering sites and has now emerged as the steel pipe pile mega-solar mounting foundation method "ECS-SS Method." 【Features】 ○ Proposes optimal overall design for the mounting structure and foundation piles. ○ High construction precision and performance. ○ Low noise, low vibration, zero residual soil discharge, and no environmental pollution, making it an ecological product. ○ Achieves shortened construction time and low costs. ○ Guarantees high quality with a consistent management system. For more details, please contact us or download the catalog.

  • Earthworks
  • Piles, caissons, sheet piles
  • Pile and foundation work

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録